Architecture Design Tips for Building Consents
When embarking on a new construction project, one of the crucial steps is obtaining building consents. Here are practical, NZ‑specific tips to de‑risk your submission.
- Confirm the correct compliance pathway (Acceptable Solutions vs Alternative Solutions).
- Coordinate early with structural, geotech, and energy reports to avoid RFIs.
- Provide complete fire, moisture, durability, and bracing documentation.
- Label materials/specs clearly and update schedules to match drawings.
- Include construction methodology where relevant and sequence notes.
Clear, complete documentation reduces council processing time and prevents rework.
Comments